Provenance

Sources behind the reactor data

Every curated reactor entry links to the source used for its current snapshot. Where programme status changes faster than technical specifications, the linked source remains the authority.

Curated reactor records11
Snapshot date21 September 2026
Profile ruleSource + verification date

How we choose a source

1. Reactor-specific authority first

Vendor, operator, regulator, government or project-owner material is preferred for design specifications and programme milestones.

2. Established databases for cross-checking

IAEA PRIS and established nuclear-industry databases are useful for operating-fleet context and cross-checks.

3. Status wording stays conservative

A selection, test, licence filing or construction milestone is not rewritten as commercial operation. The exact status phrase remains visible on the reactor profile.

Reactor snapshot sources

  1. Kaleidos — Radiant verified 2026-09-21
  2. eVinci — Westinghouse verified 2026-09-21
  3. Xe-100 — X-energy verified 2026-09-21
  4. NuScale Power Module — NuScale verified 2026-09-21
  5. BWRX-300 — GE Vernova Hitachi verified 2026-09-21
  6. Natrium — TerraPower / GE Hitachi verified 2026-09-21
  7. Rolls-Royce SMR — Rolls-Royce SMR verified 2026-09-21
  8. Aurora Powerhouse — Oklo verified 2026-09-21
  9. AP1000 — Westinghouse verified 2026-09-21
  10. APR1400 — KHNP / KEPCO verified 2026-09-21
  11. EPR — EDF / Framatome verified 2026-09-21

Reference sources for calculator context

How freshness works

Technical design values often move slowly; project status can change in days or months. Each profile therefore shows a verification date. The development tracker is a dated snapshot, not live telemetry.

See something stale or wrong?

Use the correction workflow. The most useful report includes the reactor name, the field that appears wrong, and a regulator, operator, government or vendor source that supports the correction.