Data center sizing

Data center nuclear power calculator

Turn an IT-load estimate into facility power, peak demand and a transparent first-pass reactor-module plan. Every assumption stays editable.

PUE = total facility energy ÷ IT equipment energy. The 1.15 default is an editable example, not a site benchmark.

Average facility load—
Peak design load—
Base modules for peak—
Planned modules incl. reserve—
Installed capacity—
Annual facility demand—
Annual generation at entered CF—
Annual energy coverage—
—

Screening model only. It does not simulate refuelling/outage schedules, grid backup, UPS/generator systems, cooling topology, transmission, licensing, siting, security, fuel supply, economics or hourly load shape.

How the screening model works

Separate IT load, facility overhead, peak capacity and annual energy.

A single “MW” number can hide four different questions. This calculator keeps them visible instead of folding them into one score.

1 · PUE

IT MW → facility MW

Average facility MW = average IT MW × PUE. Cooling, power conversion and other facility loads are included through the PUE assumption.

2 · PEAK

Average → design load

Peak design MW = average facility MW × (1 + headroom). This is a simple planning margin, not an hourly load forecast.

3 · MODULES

Capacity → unit count

Base modules are rounded up to cover peak MW; optional reserve modules are then added. The one-module-out check makes the resilience assumption explicit.