EDF / Framatome

EPR

Large Generation III PWR in the roughly 1,650 MWe class, designed for high-output baseload generation.

Output position in this dataset#11 of 11Sorted by electrical MWe, smallest to largest
Illustrative annual electricity13,298 GWh/yearAt a 92% planning capacity factor
Household-energy equivalent1,266,446Using 10,500 kWh/year per household

The annual-energy and household figures are scale illustrations, not project forecasts. Change those assumptions in the reactor output calculator.

Technology snapshot

Electrical output1650 MWe
Thermal output4500 MWt
ClassLarge reactor
TransportableNo
Reactor typePressurized water reactor
Coolant / heat transferLight water
FuelLWR fuel
RefuelingPlant-specific fuel cycle
Region / marketEurope / China

What do these attributes mean for common use cases?

This is an attribute check, not a project recommendation. Site, grid, licensing, fuel, security and economics still need project-specific analysis.

Common questionWhat this design data says
Grid electricity?1650 MWe electrical nameplate in the current design snapshot.
Useful heat?Not presented in this dataset as a heat-use design.
Remote / isolated deployment?Not a primary small/remote scale signal.
Transportable system?No — this profile treats it as a fixed-site design.
Current programme phase?Operating Operating / commissioning / construction

Programme status

Operating / commissioning / construction. Large Generation III reactor fleet.

Taishan, Olkiluoto, Flamanville and UK projects.

Status describes the programme at the verification date. It does not imply commercial availability, licensing in your jurisdiction, construction certainty or guaranteed schedule.

Closest designs by electrical output

These are the three nearest entries in the Nuclear Planner dataset on a ratio-based MWe scale. They are not claimed to be technical substitutes.

Source and verification

Primary / authoritative source used for this snapshot →

EDF describes the EPR as a 1,650 MW-class reactor; exact net/gross output varies by project and site conditions.