Interactive sizing tool

How many reactors would your load require?

Use a transparent planning calculation to compare unit counts and a simple one-unit-out average-load screen across representative designs. It is a scale tool, not a siting, reliability, licensing or engineering model.

Illustration of a nuclear plant connected to electrical infrastructure
Nuclear power and grid · conceptual illustration · Illustration: Nuclear Planner · original conceptual artwork

Planning assumption, not a guarantee for any reactor or project.

Required nameplate—
Annual load energy—
Household-energy equivalent—
Designs compared12

How many units?

Sorting changes display order only; it is not a project recommendation.

Formula: required nameplate MW = continuous load × (1 + reserve margin) ÷ planning capacity factor. Unit count is rounded up. The one-unit-out screen then removes one unit and multiplies the remaining nameplate by the entered capacity factor before comparing it with the base load. It is a transparent first-pass resilience screen, not an outage schedule, reliability study, grid assessment or engineering recommendation.

Latest dataset verification: 30 September 2026. Individual profiles show their own verification dates; reactor programmes and deployment schedules can change.